So on Saturday Dr. Tweak and I went to work on project Stuart Little. We met here at 11 and went to work. I started by reinstalling the wiring for the chassis.


Meanwhile Dr. Tweak was hard at work welding new motor mounts for an MR2.

Then I reinstalled all of the headlights. I was missing two bolts and found that they were in the bump stops for hood! So the chassis harness and headlights are done.

Now it was time to remove the C.V. axles and the 5S and inspect it before we get ready to reinstall it.

When I had the motor almost out of the engine bay, Dr. Tweak informed me that we were not going to reinstall the motor. I was still jacking the motor up as he was pointing at the block stammering. I said "yes we are, why wouldn't we? This is why we wouldn't




So we opted for the 3SGTE of course. We are ordering a turbo and going with a water to air inter-cooler. The 3S had a Stage 4 Spec clutch with it and were not going to use it. We are going to use the aluminum flywheel and get a staged clutch plate.
I started to reinstall the interior while Dr. Tweak looked over the 3S.

We pulled the plugs to verify the condition of the 3S. It had been outside for some time apparently and has some rust issues we are going to need to deal with. Luckily the motor isn't locked up.
Here is the #3 plug when we pulled it.
At the end of the day we decided that the 3S needs some work before being installed.

It def. needs a rear main seal, timing belt, water pump (while were there), a good engine cleaning, the new injectors, clutch plate, turbo, the axles repacked, the Wiring conversion completed, an exhaust system, and the water to air inter-cooler system built for it. Then we have to finish reinstalling the interior (almost done).
There is plenty more to be done. We will be over there this weekend and get some more done on it. Wish us luck.
This post has been edited by PhoenixTech: Dec 22, 2008 - 10:41 AM